How to Plan for Emissions Testing

Prior to the start of any project, our team leaders connect with the client to assure full understanding of all job requirements. Our goal is to address each requirement while utilizing the most proven technologies, and minimizing time for completion.

What you do…

CLIENT RESPONSIBILITIES
  • Type of source and operational hours
  • Location of source (maps are beneficial)
  • Name of plant technical contact, telephone, and facsimile numbers
  • Safe access to source, physical dimensions of source, elevation, and any special requirements (i.e., confined space entry)
  • Proposed test dates and special schedule requirements (i.e., test between certain hours)
  • Operational permits and any special request from the regulatory agency
  • Clearance of testing personnel and vehicles
  • Coordination of process conditions

What we do…

TEST TEAM RESPONSIBILITIES
  • Prepare necessary pretest documentation for notification to regulatory agency
  • Setup of sampling equipment and modification to allow for test to be accomplished in a timely fashion
  • Test in accordance to USEPA or State’s Reference Methodology
  • Coordination of test times with facilities representative
  • Calibration of test equipment
  • Analysis of test samples, computation, and reporting of final results

GET YOUR SITE READY: JOB SITE REQUIREMENTS

Generally, four (4) inch inside diameter ports are adequate for the majority of the tests, however two (2) inch may be required, and some test apparatus require up to a six (6) inch inside diameter test ports. If there are no existing sample ports or new ports need to be installed, GCI will assist with the sample port layout and the number of ports required.

  • GCI Crew members require safe access to the test location.
  • Scaffolding or lifts should be provided prior to the arrival of the GCI test crew
    (if necessary).
  • Site accessibility by cargo vehicle for transportation of test equipment is appreciated.
  • Test Trailer Power Requirements – Single phase, 220 volt 30 amp or 110 volts 20 amp, grounded electric service within approximately 50 feet of the sample location.
    (Differs by Test Mobile Lab)
  • Test Location Power Requirements – Two, 110 Volt 20 amp individual power circuits.

OFFICES

Ohio • 510 Dickson Street, Wellington, OH 44090
North Carolina • 1855 Sipe Road, Conover, NC 28613
Indiana • 684 Tower Road, Plainfield, IN 46168

OFFICES

Ohio 
510 Dickson Street, Wellington, OH 44090
North Carolina
1855 Sipe Road, Conover, NC 28613
Indiana
684 Tower Road, Plainfield, IN 46168


CONTACT

FOLLOW

avetta
sam

© 2024 Grace Consulting Inc. All rights reserved.

Request a Proposal

Please provide the following information and a member of our team will be in touch with you shortly.